Qingdao Jiuhe Heavy Industry Machinery Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Lee Michael
  • Company Name : Qingdao Jiuhe Heavy Industry Machinery Co., Ltd.
  • Tel : 86-532-88563257
  • Fax : 86-532-88563253
  • Address : Shandong,Qingdao,NO.90 Zhujiang 2nd Road, Lijiaxicheng East Village, Huanxiu Community, Jimo, Qingdao.
  • Country/Region : China

On Sale New Concrete Pump XBS25-08-33 hydraulic concrete pump for sale

On Sale New Concrete Pump XBS25-08-33 hydraulic concrete pump for sale
Product Detailed
Related Categories:Concrete Pumps
On Sale New Concrete Pump XBS25-08-33 30mm(20mm)aggregate 380V CE ISO

On Sale New Concrete Pump XBS25-08-33 hydraulic concrete pump for sale  

Comparison between pumping mortar and fine stone by XBS25-08-33 and hoisting mortar and fine stone by hoister

 

Based on the same site conditions and building, we take the ground handling of a project in Qingdao city as an example: all the building s are three units and 32 floors. Each floor is for 12 households. The total area is about 32,000 m2.

1. Persons needed for the conveying by fine stone concrete pump.

1 operator for fine stone concrete pump, 2 operators for two sets of mixers, 2 persons for cement supply, 2 persons for sands and stones supply, 2 persons for floor cleaning, 2 persons for placing, 4 persons for floor leveling. Total:15 persons.

Usually, we take the average conveying capacity as 12m3/h ( this data is for fine stone concrete pump under the condition of both working and non-working while the theoretical capacity is 20m³/h). 12m3/h*8h/day=96m3/day, placing thickness 5-6cm, so it is 1920m2/day and 128m2/day/person. It needs 17 days for the whole project.

2. Persons needed for the hoisting by hoister:

2 operators for two sets of mixers, 2persons for cement supply, 2 persons for sands and stones supply, 8 persons for manual conveying, 2 persons for floor cleaning, 4 persons for placing, 2 persons for floor leveling. Total:20 persons.

Usually, two trucks for the hoister; it needs about 6 minutes for low floors and 12 minutes for high floors to hoist 0.06m3/time/truck. Convey mortar and fine stone as 6 times 12 trucks per hour, divide 8 persons into 4 teams, so 12 trucks*0.06m3/truck/h*8h/day*4 teams=23m3/day. It is about 460m2/day and 21m2/day /person. It needs 70 days for the whole project.

Technical parameter

 

Items

Units

Parameters

Whole machines performance

Theoretical max. discharging volume

m³/h

25

Theoretical max. delivery pressure

Mpa

8

Max. delivery frequency

times/min

24

The type of distribution valve

 

S valve

Specification of delivery cylinder

mm

Φ140×800

Specification of main oil cylinder

mm

Φ80×Φ50×800

Outlet opening diameter

mm

Φ125

Hopper capacity

L

300

Power system

Rated voltage

V

~380

Main Motor model

 

Y200L-4

Main motor power

Kw

30

Rated speed

r/min

1470

Assistant motor model

 

Y100L2-4

Assistant motor power

Kw

3

Rated speed

r/min

1430

Hydraulic system

Hydraulic oil circuit type

 

Open circuit

Max. oil pressure of pumping system

MPa

25

Max. oil pressure of mixing system

MPa

9

Max. mixing speed

r/min

24

Oil tank capacity

L

200

Other parameters

Max. diameter of aggregates

mm

≤30(≤20)

Inner dia. of delivery pipe

mm

Φ100/Φ80

Dimension

(length×width×height)

mm

4100×1500×1500

Overall weight

Kg

2000

Pulling speed

Km/h

≤8

On Sale New Concrete Pump XBS25-08-33 hydraulic concrete pump for sale



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.